1887

Capacity adequacy in the Nordic electricity market

image of Capacity adequacy in the Nordic electricity market

An increasing share of intermittent renewable generation and reduced profitability of conventional power generation has led to a growing concern for capacity adequacy in the Nordic electricity market (Nord Pool market area). It does not make sense to assess capacity adequacy for each country separately in the Nord Pool market area as it is highly integrated in terms of both interconnector capacity and market integration. Capacity challenges are rarely isolated to one country or bidding zone. This report analyses what market solutions may be used to manage capacity adequacy in the Nord Pool market area, and how an efficient transition to adequate market solutions could be achieved. The main analysis reveals several measures that would strengthen price formation and cost recovery in the Nord Pool market area, although in general, the market is already highly liquid and well-functioning.

English

.

The The-MA power market model

The-MA is a newly developed advanced power market simulations model developed by THEMA Consulting Group. The people behind the model have a long track record in modeling and model development. The-MA has proven its worthiness in a wide range of applications from price forecasts to scenario and interconnector analysis, for client such as OED, MD, Statnett and many more.

English

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error