Projected Costs of Generating Electricity 2005
This sixth study in a series on projected costs of generating electricity presents and analyses cost estimates for some 130 power and co-generation (heat and power) plants using coal, gas, nuclear and renewable energy sources. Experts from 19 OECD member countries, 2 international organisations and 3 non-member countries contributed to the study.
The levelised lifetime costs presented and analysed were calculated with input data from participating experts and commonly agreed generic assumptions, using a uniform methodology. Key issues related to generation costs are addressed in the report, including methodologies to incorporate risk in cost assessments, impact of carbon emission trading and integration of wind power into electricity grids.
A reference in the field, this publication will be of interest to energy policy makers, electricity system analysts and energy economists.
Also available in: French
- Click to access:
-
Click to download PDF - 3.15MBPDF
Input Data and Cost Calculation Framework
Nuclear Energy Agency
Like the previous studies in the series, the present report is based upon technical information and cost data provided by experts from participating countries. Costs and technical data were collected through a questionnaire sent to members of the expert group and experts from countries which were not represented in the group but were willing to contribute information for the study.
- Click to access:
-
Click to download PDF - 339.63KBPDF